– has at any time and for any reason the right to request the provision of an arbitrary tool for – After receiving the notification, CONTRACTOR makes these tooling parts available only for collection in the premises where the tooling is located within ten (10) working days. Removes the tool from the site and supports all collection and loading costs, but CONTRACTOR provides appropriate assistance as needed. For ADFs and similar documentation, a digital copy of this documentation must be provided within one day of the request for such ADF documentation. All tool objects held by CONTRACTOR are clearly identifiable as belonging to – by a permanent method corresponding to the specific purpose of the tool in a form to be agreed to by the parties. AS part of this interim cooperation, CONTRACTOR manufactures in its own factory or will source from third parties as part of this interim cooperation. Tools must include: devices, devices, equipment used in the manufacturing process. In addition, the concept of tool construction (DFA) must be used for the contractor, which refers to the layout of the assembly line and the physical assembly of the product – The procedure for using these tools is provided for in this agreement. This Agreement is governed by the laws of ` All disputes under this Agreement are settled by litigation before the ` ` The dominant party in a court proceeding has the right to recover from the other party its reasonable fees, costs and expenses. In addition, it is entitled to obtain, prior to the judgment, a seizure of the assets of the CONTRACTORS company as a guarantee of payment of judgments and costs. This contract is written in the English language and – In the event of a dispute, the original language of this contract is checked.

He mainly represents companies active in emerging countries after years of establishing and maintaining a global and professional network. If CONTRACTOR does not provide the tool parts to – after sending the Article 5 notification, CONTRACTOR is required to pay the contractual damages to – The amount of these contractual damages is the replacement cost of 125% for each tool item, as shown in the tool sheet. The amount of the loss is immediately due and payable if CONTRACTOR does not provide the requested tool items. If the tooling is ordered by contractor, the contractor provides the confidential specifications necessary for the manufacture of these tools. The contracting parties agree in advance (a) of the organization that presents the design of the tool and b) the costs of designing and manufacturing the tools and c) how to pay for those costs. When the costs are paid, the owner of the tool is the owner. Regardless of the payment of fees, the design of the tool and all of the associated intellectual property is owned in accordance with Article 2 above. CONTRACTOR shall not use the tools or confidential information for any purpose other than the manufacture of products for any use of the tools for the manufacture of products by the CONTRACTOR or for the sale of products to third parties other than – constitutes a violation of this agreement.